PRE/OBRA · CONSTRUCTION BUDGETING AND COST CONTROL SYSTEM

From the budget to real control of the jobsite.

A construction budgeting and cost system that brings the approved budget, actual costs and execution progress together on one platform — with reliable, real-time information.

Official odoo Partner100% developed in Uruguay
odooimplemented by OKentra
−43%
Time to build a budget
+18%
Tender win rate
3 wks
Average implementation
100%
Developed in Uruguay

The starting point

In many companies, cost control doesn't keep pace with the complexity of the works

Budgeting and control still rely on fragmented tools and obsolete technology. The result isn't just disorder: it's profitability discovered when it can no longer be corrected.

Scattered, disconnected spreadsheets

Someone built the unit price analysis in Excel, the latest version lives on their laptop, and every new project starts by copying the previous file.

Duplicated information

Physical progress is entered by hand, progress billing is redone in another system, and material purchases never hit the work item cost.

Knowledge that depends on one person

The budget logic lives in the head of whoever builds it. If that person leaves, the company's costing criteria leave with them.

Little real-time control

When actual cost exceeds budget nobody finds out until month-end close — or until the project has already lost money.

The solution

Real control of budgets and costs on a single platform

A single engine connects the approved budget with actual costs and site progress — on odoo 20, integrated with your ERP.

Real, connected control

Direct connection between the budget and site execution.

Full integration

Approved budget, actual costs and site progress in real time.

The flexibility of Excel, without the errors

All the ease of building your budget, with the safety of a tamper-proof, auditable database and no broken formulas.

odoo PreObra

End-to-end platform

Powered by odoo

A solid ERP platform tailored to construction.

Full lifecycle

End-to-end management: budgeting, cost control, variances and decisions.

Transparency and traceability

A foundation to audit and manage projects of any size.

Budgeting structured by work items
Direct and indirect costs
Tracking against the approved budget
Variances and alerts
Ready for projects of any scale

Budget control is not a luxury, it is a necessity

PreObra brings together budget, costs and actual site progress so you can decide with reliable, real-time information.

Budget
Unit price analysis, take-offs and approved work items.
Costs
Actual costs posted by cost item.
Actual site progress
Progress billing and physical advance, live.
Decision-making
Variances and profitability to decide.
OKentra PreObra — beneficios clave: transparencia, trazabilidad, información en tiempo real, menor dependencia de planillas, mejor toma de decisiones y preparación para auditorías

Sectors

One tool, five ways to use it

The same calculation engine, different flows for roads, building, industrial, hydraulics or concessions.

SECTOR / 01

Roads

Paving, bridges, structures. Take-offs by chainage, certification with the roads authority, earthworks control.

SECTOR / 02

Building

Residential, retail, offices. Budgets per unit, progress by tower, subcontract management.

SECTOR / 03

Industrial

Plants, EPC, installations. Engineering + procurement + construction in one budget, with WBS and disciplines.

SECTOR / 04

Hydraulics

Sanitation, drinking water, networks. Take-offs by pipe run, joints and certification by linear progress.

SECTOR / 05

Concessions

Road maintenance, lighting, public spaces. Recurring service orders, KPIs, penalties and bonuses.

Ingeniero de obra consultando el avance del proyecto en OKentra PreObra desde una tablet reforzada

Field hardware

Software is useless if the data never leaves the site

We supply and maintain the equipment that records progress in the mud, not in the office. One party accountable for both the system and the devices.

Ruggedised tablets
Site phones
Inspection drones
Mobile racks
Safety totems

Features

Coverage for every stage of the project

From the initial budget to project handover, integrated with the ERP.

1

Budgeting

Unit price analysis (UPA)
Quantity take-offs
Work items and lines
Comparable versions
2

Planning

Schedule and Gantt
Investment S-curve
Milestones and phases
Physical progress
3

Progress billing

Progress certificates
Approvals
Authority / linear certification
Full history

Price indexation

Polynomial formulas calculated automatically, so inflation does not eat into your progress billing.

4

Cost control

Actual cost vs. budget
Variances by work item
Site cash and cash flow
Profitability
5

Purchasing and materials

Site requisitions
Site inventory
Suppliers

Subcontracts and piecework

Cross-check actual physical progress with what you owe each subcontractor, without overpaying.

6

Reports

KPIs by project and site
WBS and disciplines
Contractual KPIs
Exports

Site control

S-curve, variances and progress billing, in real time

Every progress certificate, every variance and every physical advance is reflected instantly against the original budget. No parallel spreadsheets, no surprises at closing.

OKentra PreObra: presupuesto, análisis de costos y Curva S del proyecto en tiempo real
BudgetUSD 4.820.000
ExecutedUSD 2.989.000
CertifiedUSD 2.640.000
Variance
−1.4%
S-curve
+2 days

Implementation

On site in three weeks on average

A 30-minute call with an actual implementer (not a salesperson): we show you the system with data like your company's and tell you honestly whether it fits.

1
Diagnosis
2
Assessment
3
Configuration
4
Migration
5
Training
6
Go Live

FAQ · Trust

We answer your main questions

Yes. The same calculation engine adapts to roads, building, industrial, hydraulics and concessions, with workflows and progress billing specific to each sector.

We show you how it would look on your site

A 30-minute guided demo with a real implementer. No sales run-around.